|国家预印本平台
首页|BEPCII and CEPC

BEPCII and CEPC

BEPCII and CEPC

来源:Arxiv_logoArxiv
英文摘要

In this paper BEPC, BEPCII and BEPCII-U have been briefly reviewed, which lay a good foundation of CEPC as a Higgs factory. BEPCII reached the designed luminos-ity goal of 10^33cm^-2s^-1 @1.89GeV on April 5, 2016. As an upgrade program of BEPCII, BEPCII-U has been com-pleted and started commissioning in March of 2025 with the luminosity goal as 3.7*10^32cm^-2s^-1 @2.8GeV. CEPC as Higgs factory has been reviewed on Engineering De-sign Report (EDR) status and plan for construction proposal to Chinese government in 2025.

Jie Gao

加速器

Jie Gao.BEPCII and CEPC[EB/OL].(2025-05-05)[2025-06-06].https://arxiv.org/abs/2505.02401.点此复制

评论