|国家预印本平台
首页|竖井地基热排水固结模型试验研究

竖井地基热排水固结模型试验研究

Model test on thermal drainage consolidation of foundation with vertical drain

中文摘要英文摘要

设计竖井热排水固结模型试验系统,选取宁波地区典型软黏土,在室温和水热循环温度70℃下分别开展排水固结和热排水固结模型试验,分析了加热、分级堆载、恒载降温阶段各测点的温度、孔隙水压力及地表沉降变化规律,结果表明:热排水固结法可加速地基模型的固结速率,固结度达到90%所需时间较之排水固结法减少显著;经过温度历史后,地表最终沉降量增加,土的抗剪强度有所提高,增强了软基处理效果。

Model test system is firstly designed for thermal shaft drainage consolidation, then tests of thermal drainage consolidation and drainage consolidation are carried out by selecting typical soft clay of Ningbo area in the room temperature and the hydrothermal fluid circulation temperature of 70℃, respectively. The change law of temperature and pore water pressure of each measuring points and ground surface settlement are analyzed for the heating, step loading and cooling (constant load) stage, and the mechanism of thermal drainage consolidation is preliminary elaborated. The test results show that the thermal drainage consolidation method can accelerate the consolidation rate of the ground model, and consolidation time required to achieve the 90% reduction compared with drainage consolidation method significantly. After the temperature history, the final settlement of the surface is increased, shear strength is improved, and the soft ground treatment effect is enhanced.

尹铁锋、陶海冰、邓岳保、刘干斌、范高飞

水利工程基础科学

热排水固结模型试验竖井地基沉降

hermal drainage consolidationmodel testshaft foundationsettlement

尹铁锋,陶海冰,邓岳保,刘干斌,范高飞.竖井地基热排水固结模型试验研究[EB/OL].(2015-06-18)[2025-08-18].http://www.paper.edu.cn/releasepaper/content/201506-237.点此复制

评论