一座顶推施工连续梁桥的结构与工艺设计构思
Structure And Technological Design Conception Of A Incrementally Launched Prestressed Concrete Continuous Beam Bridge
介绍了一座连续梁桥主梁截面尺寸选择、桥梁分段设计、桥梁下部结构型式,顶推平台的布置,探讨了主梁预应力设计新技巧。
his paper presents the selection of dimension of girder,box beam design, the design of bridge substructures,and layout of incrementally launching platform, probe into new design technique of main girders prestresses of a incrementally launched prestressed concrete continuous beam bridge.
上官兴、周振华、郜小兴
公路运输工程工程设计、工程测绘
连续梁顶推设计
continuous beamIncrementally launchingdesign
上官兴,周振华,郜小兴.一座顶推施工连续梁桥的结构与工艺设计构思[EB/OL].(2009-08-27)[2025-08-10].http://www.paper.edu.cn/releasepaper/content/200908-470.点此复制