临汾河西热电新建2×300MW 机组电气主接线可行性分析
Linfen Newly built Heating Power plant 2×300MW unit electricity main wiring feasibility analysis
电气主接线的选择,应本着具体问题具体分析的原则,根据本厂电源点在电力系统中的地位和作用、负荷性质、出线回路数、设备特点、周围环境及发电厂规划容量等条件和具体情况,在满足发电可靠性、功能性、具有一定灵活性、还拥有一定发展裕度的前提下,尽量选择经济、简便实用的电气主接线。本文通过对现场实地勘测,以及对对侧刘村变电站所提供条件的分析,并且严格按照电网相关规定和火电厂设计技术规程规定,综合电气主接线的可靠性、经济性、实践可行性原则,做出临汾热电新建2×300MW 机组电气主接线最终的设计规划。
he electrical main wiring's choice, should in line with the concrete question concrete study principle, according to this factory power source in conditions and the special details and so on electrical power system's status and function, load nature, going beyond a line return route number, equipment characteristic, environment and power plant plan capacity, in satisfies the electricity generation reliability, the functionality, to have certain flexibility, also to have under certain development allowance premise, chooses economically, the simple practical electrical main wiring as far as possible. This article through surveys on the spot to the scene, as well as provides the condition to the opposite side Liu village transformer substation the analysis, and strictly stipulated according to the electrical network related stipulation and the thermoelectric power station design technique regulations, the comprehensive electrical main wiring's reliability, the efficiency, the practice feasible principle, make the Linfen thermoelectricity newly built 2×300MW unit electricity main wiring final design plan.
王中
发电、发电厂输配电工程
电气主接线技术规程热备用断路器母线
Electrical main wiringechnical scheduleHot spareircuit breakerBus bar
王中.临汾河西热电新建2×300MW 机组电气主接线可行性分析[EB/OL].(2010-09-09)[2025-08-10].http://www.paper.edu.cn/releasepaper/content/201009-248.点此复制
评论