|国家预印本平台
首页|全站仪结合Excel在设备安装定位中的应用

全站仪结合Excel在设备安装定位中的应用

pplication of total station combined with Excel in equipment installation and location

中文摘要英文摘要

在工业设备安装定位工作中,直接应用全站仪放样功能一般较难满足其精度要求,而通常需要对放样点位进行多次精密测量和归化调整。为快速准确地计算归化改正量,提高工作效率,本文以某玻璃切割设备机组安装测量的工程实践为背景,探讨了一种全站仪与Excel相结合的工作模式,能够实时指导放样工作的顺利进行。实践表明该模式简便易行、实时性好、工作效率高。

uring some equipment installation and location work, accuracy requirement often can't be met if directly applying layout programme of total station. So, precise measurement and corrected adjustment of setting-out points is often carried out for many times. In order to quikly and accurately calculate adjusted value and improve work efficiency, based on a glass cutting machine equipment installation engineering practice, a new working pattern of total station combined with Excel is studied, which can provide real-time guide for layout smoothly. The practice shows that the pattern is simple, real-time and efficient.

于胜文、葛文海、刘尚国

工程设计、工程测绘

全站仪Excel工程放样归化法地脚螺栓

otal StationExcelEngineering Setting-outReduction MethodAnchor Bolt

于胜文,葛文海,刘尚国.全站仪结合Excel在设备安装定位中的应用[EB/OL].(2010-12-28)[2025-08-02].http://www.paper.edu.cn/releasepaper/content/201012-1227.点此复制

评论