工业输煤长廊的控制爆破拆除

emolition of Industrial Transport Corridor of Coal by Controlled Blasting

中文摘要英文摘要

内蒙古第一机械集团欲爆破拆除一工业输煤长廊,但爆区周围环境复杂,厂区天然气主管道与待爆建筑紧密相邻。为减少拆除建筑结构倒塌时对其的影响,采用了不同炸高,定向倾倒的爆破方案。分别给出了建筑物拆除爆破参数、起爆网路及安全防护措施。爆破取得预期效果,周边安全无恙。

he First Machine Group of Inner Mongolia would demolish Industrial Transport Corridor of Coal by controlled blasting in complex environment.The chief pipeline of natural gas was close to the aim building.To reduce the influence from blasting and ensure the safety of chief pipeline,the controlled blasting program of different explosive height and directional collapsing was adopted.The blasting parameters,blasting circuit and protection measures were presented and taken.The blasting effectiveness is satisfactory.

伍永福、袁绍国、张健、高志军、张欣

矿山建设、矿山设计矿山安全、矿山劳动保护

输煤长廊控制爆破爆破拆除爆破参数安全措施

ransport Corridor of Coalcontrolled blastingdemolition blasting