旋挖式成孔和后压浆工艺在钻孔灌注桩中的应用

pplication of churning driven hole-drilling method

中文摘要英文摘要

对旋挖式成孔和采用桩端、桩侧后压浆工艺的三根钻孔灌注桩进行自平衡测试,检验旋挖式成孔和后压浆工艺对单桩承载力的影响,将测试结果与按规范计算的承载力进行对比,证明两种工艺对钻孔灌注桩单桩承载力的提高有显著效果。

In this paper, Static load tests were carried out with self-balanced testing on there bored piles, which used churning driven hole-drilling method、shaft grouting and base grouting ,tested the bearing capacity of piles influenced by churning driven hole-drilling method and post grouting , comparing the results with bearing capacity of piles calculated by criterion, the bearing capacity of piles were improved obviously carried by the two techniques.

薛国亚、卢波、张浩文、林志欣

水利工程施工水工结构工程基础科学

自平衡测试旋挖式成孔后压浆侧摩阻力端阻力

self-blanced testingchurning driven hole-drilling methodpost groutingside friction resistancebase bearing