基于WEB GIS的通信网资源管理系统中最短路径算法的应用
he Application of The Shortest Path Algorithm in Telecommunication Network Resource Management System Based on WEB GIS
本文主要关注综合网络管理系统中随时可能遇到的通信线路故障情况,为了避免通信线路的过载故障并将对通信质量的影响降到最低,必须在最短时间内找出最适合的备用线路。在这个项目中需要考虑的约束条件主要是时间花费和线路的实时负载。简单的最短路径算法明显不适用于现实中的此类情况,作者对最短路径算法进行了广泛的研究,进行了必要的改进,得到了适合实际项目中应用的算法。
his paper focuses on applying the shortest path algorithm to the communication lines management module. The function is about finding the most appropriate alternative line when there’s an early warning about the heavy load of a segment. In order to avoid the over-loaded fault and reduce the impact on communication quality, an appropriate alternative line must be found in the limited time. To realize this function, it requires more consideration of its current load and the time cost rather than the distance. So in this paper, we have to modify the shortest path algorithm and improve its time cost to fit the requirements.
郑妍枫
通信计算技术、计算机技术电子技术应用
WEB GIS网络资源管理最短路径算法ijkstra
WEB GISNetworks Resource Managementthe Shortest Path Algorithmijkstra
郑妍枫.基于WEB GIS的通信网资源管理系统中最短路径算法的应用[EB/OL].(2010-01-08)[2025-08-10].http://www.paper.edu.cn/releasepaper/content/201001-330.点此复制
评论