作业成本法是一种先进的成本核算方法。本文以桥梁工程施工成本为研究对象,基于工程量清单建立作业体系。通过工程实例进行作业成本计算,将结果与清单价格对比分析证明作业成本法成本计算的准确性,为施工企业实施作业成本法提供参考。
ctivity-Based Costing is an advanced method on cost calculation. Taking the cost of bridge construction as the object of study, basing on the bill of quantities, an activity system is established. Activity-Based Costing is performed through a practical bridge engineering constriction case. The results are compared and the accuracy of Activity-Based Costing is proved, hoping that it can be taken as reference to help construction companies to apply Activity-Based Costing on practical project.
何晓源
交通运输经济公路运输工程工程设计、工程测绘
作业成本法桥梁工程成本计算作业成本动因清单
ctivity-Based CostingBridge Constructionctivityost DriverBill of Quantities
何晓源.桥梁工程施工作业成本计算探讨[EB/OL].(2008-12-23)[2025-08-11].http://www.paper.edu.cn/releasepaper/content/200812-700.点此复制