云南糯扎渡水电站上游围堰防渗墙在施工前对填筑层和两岸坡积带进行了预灌浓浆处理,减少了漏浆和塌孔现象,给防渗墙造孔施工带来了很大便利,同时有效地缩短了节点工期,为后续围堰施工赢得了更充裕的时间。本文对糯扎渡水电站围堰防渗墙预灌浓浆施工工艺进行了详细介绍,并对部分改进工艺进行了说明
Before the cut-off wall construction of the Yunnan Nuozhadu Hydropower Station upstream cofferdam,the cofferdam’s filling layer and the two sides of the bank’s slope plot had been pre-grouted with thick slurry.So during the construction of the cut-off wall,the phenomenon of the slurry leakage and the collapse of the cut-off wall notches were widely reduced,providing a great convenience to the cut-off wall construction.At the same time, the length of the node construction had been effectively reduced and won more time for the follow-up cofferdam construction.In this paper,the cut-off wall pre-grouting thick slurry construction technique and the improvement of the process had been described in detail.
陈卫、熊君
水利工程施工水工结构水能利用、水电站工程
围堰防渗墙预灌浓浆
cofferdamcut-off wallpre-groutingthick slurry
陈卫,熊君.预灌浓浆在糯扎渡水电站防渗墙施工中的应用[EB/OL].(2009-09-17)[2025-08-06].http://www.paper.edu.cn/releasepaper/content/200909-469.点此复制
评论