近距离空间交叉软岩巷道底鼓治理方法

lose-up of space at the end of soft rock roadway cross-drum treatment

中文摘要英文摘要

近距离空间交叉巷道多次受地应力影响,会反复出现喷体开裂、底鼓、巷道变形等情况.。传统的修护方法是卧底,对巷道开裂、变形的地方进行处理、锚网喷临时支护、扶金属拱形棚,这种被动支护,没有利用巷道在地应力作用下周期变化的原理,使巷道长期处于失稳状态,本文对近距离空间交叉巷道的修护进行了积极有效探索,取得了较好效果。

lose spatial cross roadways are affected many times by the stress which will be repeated spray body cracking, at the end of the dark, tunnel deformation, etc.The traditional method is undercover on the roadway cracking, deformation of the local processing, anchor net spray temporary support protection, supporting the metal arched shed that is a passive supporting method, the above-mentioned above do not take advantage of the principle which is roadway in the stress cycle changes, so that the status of roadway has been a long period of instability, the paper study the close spatial cross roadway repair carried out active and effective exploration and achieved better results.

李江锋

矿山压力、矿山支护

控底锚杆延长巷道变形时间联合支护

boltextending the roadway deformation timejoint supporting

李江锋.近距离空间交叉软岩巷道底鼓治理方法[EB/OL].(2009-08-28)[2025-08-21].http://www.paper.edu.cn/releasepaper/content/200908-510.点此复制

评论