铁路网络仿真模拟系统的研究及软件开发
Research and Software Development of Railway Network Simulation System
目前CTCS-3级列车运行控制系统采用GSM-R网络与地面无线闭塞中心RBC设备进行通信。本文针对列控系统中无线网络无法满足测试需求的缺点,设计和实现了GSM-R网络仿真系统,它是一种轻量级且稳定性高的系统。该系统主要由SDR收发器、BTS仿真模块、PBX仿真模块以及数字中继语音卡组成,SDR收发器模块对无线数据进行收发并进行调制解调,BTS仿真模块对基带信号进行处理并将数据进行转发,PBX仿真模块完成协议的转换以及V.110速率适配,通过数字中继语音卡向ISDN服务器发送电路域数据,实现列车与地面数据通信。该系统经过实验测试,可在1s内完成呼叫建链过程,并能稳定运行保证数据的传输。
t present, the CTCS-3 train operation control system uses the GSM-R network to communicate with the RBC equipment of the ground wireless block center. Aiming at the shortcoming that the wireless network in the train control system cannot meet the test requirements, the GSM-R network simulation system is designed and implemented, which is a lightweight and highly stable system. The system is mainly composed of SDR transceiver, BTS simulation module, PBX simulation module and digital relay voice card. The SDR transceiver module sends and receives wireless data and modulates and demodulates the data. The BTS simulation module processes the baseband signal and processes the data. For forwarding, the PBX simulation module completes protocol conversion and V.110 rate adaptation, and sends circuit-domain data to the ISDN server through the digital relay voice card to realize data communication between the train and the ground. The system has been experimentally tested and can establish the call link process within 1s, and can run stably to ensure data transmission.
孙凯强、满毅
铁路运输工程无线通信通信
通信工程列控GSM-R仿真RBC
ommunication EngineeringTrain ControlGSM-RSimulationRBC
孙凯强,满毅.铁路网络仿真模拟系统的研究及软件开发[EB/OL].(2022-01-04)[2025-08-21].http://www.paper.edu.cn/releasepaper/content/202201-6.点此复制
评论