基于TSP-203 plus系统的隧道超前预报质量控制研究
Study on Improving Forecasting Quality of TSP-203 plus System
本文对TSP-203 plus 系统的组成、工作原理进行了较为详细的介绍,明确了TSP系统在实践应用中存在的问题,提出了从准确设定参数、严格控制爆破地震波质量、牢固安装接收器套管、科学合理解读信号等四方面提高预报质量的建议,为正确掌握TSP-203 plus系统、高水平隧道超前地质预报提供参考。
unnel seismic prediction (TSP) system is widely used in railway tunnel geological prediction. In this paper the construction and operating theory of tsp-203 plus were introduced. We pointed out some problems in operation of TSP system and offered four suggestions to improve the forecasting quality including setting parameters accurately, controlling quality of blasting seismic wave strictly, installing receiver tube solidly, interpreting signal scientifically and reasonably, which can be the reference to mastering tsp-203 plus system and high-level tunnel geological prediction.
张家生、胡奇凡
矿业工程理论与方法论矿山地质、矿山测量
隧道超前地质预报SP系统探测精度爆破地震波
tunnel geological predictionSP systemdetection accuracyblasting seismic wave
张家生,胡奇凡.基于TSP-203 plus系统的隧道超前预报质量控制研究[EB/OL].(2010-04-21)[2025-08-21].http://www.paper.edu.cn/releasepaper/content/201004-794.点此复制
评论