新城金矿床主容矿构造成生应力场的反演估算
Inverse estimation of stress field formed by main host structure of Xincheng gold deposit
本文依据弹性力学和莫尔——库仑剪切破裂理论,及构造地质学“羽列”与剪切带间的几何关系;对新城金矿床主容矿构造成生主应力产状,量值的解析反演估算方法和结果进行了介绍。为研究胶东焦家式金矿成矿规律和成矿预测,指导探矿提供依据。该矿主容矿构造是在NNW向缓倾拉张主应力、NE向陡倾压主应力,焦家构造带平面呈右行扭动下成生的。NWW向中间主应力控制着矿体的倾伏、侧伏。估算成矿深度的上界在2750m左右。
Based on elastic mechanics, Mohr-Coulomb shear fractural theory and geometric relationship between pinnate arrangement and shear zone in structural geology, the analytic inverse estimation method and result of principal stress occurrence and magnitudes formed by main host structure of Xincheng gold deposit was introduced to study the metallogenetic regularities and prediction and to guide exploring ores of Jiaojia-type gold deposits, northwestern Jiaodong peninsula. The main host structure of Xincheng gold mine was formed by the NNW gently inclined tension principal stress, the NE over-dip compressive principal stress and Jiaojia structural belt plane with rightward twist. Pitch and rake of orebody were controlled by the NWW middle principal stress. The upper bound of metallogenic depth was estimated about 2750m.
李俊英、李培良
矿业工程理论与方法论矿山地质、矿山测量
新城金矿羽列构造成生应力场主应力产状主应力量值莫尔——库仑破裂理论
Xincheng gold minepinnate arrangementstress field formed by structureprincipal stress occurrenceprincipal stress magnitudesMohr-Coulomb fractural theory
李俊英,李培良.新城金矿床主容矿构造成生应力场的反演估算[EB/OL].(2009-01-05)[2025-08-10].http://www.paper.edu.cn/releasepaper/content/200901-141.点此复制
评论