首页|大型组合沉井问题的数值模拟研究

大型组合沉井问题的数值模拟研究

HE STUDY OF NUMERICAL SIMULATION IN PROBLEM OF LAEGE-SCALE COMPOUNDING CAISSON

中文摘要英文摘要

以某钢铁(集团)公司炼钢场区内旋流池分项工程的主要地下结构(大型组合沉井)为研究对象,对组合沉井下沉的不同深度位置进行数值模拟分析,得出井壁的受力图、位移图和变形速度图;模拟结果基本与现场组合沉井实施情况吻合。

o a certain Iron and Steel (Group) Company steelmaking market area swirl pool breakdown of the major underground structure (large compounding caisson) to study object to the compounding caisson sinking different depth location for the numerical simulation analysis, the wall of a compounding caisson drawn by the attempt. Figure displacement and deformation velocity map; Simulation results with the combination of the scene compounding caisson implementation of the agreement.

赖正发、侯克鹏、严体、朱斌

水工结构水利工程施工

组合沉井FLAC数值模拟

compounding caissonFast Langrangian Analysis of ContinuaNumerical simulation

赖正发,侯克鹏,严体,朱斌.大型组合沉井问题的数值模拟研究[EB/OL].(2007-07-06)[2025-08-16].http://www.paper.edu.cn/releasepaper/content/200707-107.点此复制