针对陈四楼矿2409轨顺迎采动沿空掘巷工程中,小煤柱破碎,巷道围岩矿压显现剧烈问题,通过迎采动沿空掘巷围岩稳定性分析,认为特殊的时间安排和空间位置是迎采动沿空掘巷难题的关键,提出强化顶板、强化煤柱、强化初期支护的技术思想;以2409轨道顺槽迎采动沿空掘巷为工程背景,设计相应支护参数,巷道采用高强锚杆、M型钢带、金属网及锚索梁联合支护,工程实践表明巷道维护效果良好。

ccording to coal pillar crusher and violent strata behaviors of surrounding rock of roadway in engineering practice of roadway driven along next gob and heading adjacent advancing coal face on track transportation tunnel of 2409 coal face on Chensilou coal mine, Stability of rock around roadway is analyzed and this article considers that the key of the problem is special schedule and spatial location. This article puts forward a supporting thought by strengthening the roof and coal pillar and primary support.Pertinence supporting parameters has been designed for the complex geological condition of 2409 track transportation tunnel. High strength anchor bar, the steel band of model M, metal net and anchor craning beam joint support has been used in the project. Engineering practice show that maintenance result of roadway is good.

刘波涛、高明仕、赵瑶

矿山压力、矿山支护

支护技术迎采动沿空掘巷小煤柱围岩稳定

support technologyheading adjacent advancing coal faceroadway driven along next gobsmall coal pillarsstability of rock around roadway

刘波涛,高明仕,赵瑶.陈四楼矿迎采动沿空掘巷技术研究及应用[EB/OL].(2011-10-19)[2025-08-23].http://www.paper.edu.cn/releasepaper/content/201110-174.点此复制