|国家预印本平台
首页|管道渗水诱发黄土暗穴的形成过程及其可视化研究

管道渗水诱发黄土暗穴的形成过程及其可视化研究

Pipeline leakage induced the formation of loess hidden hole and Its Visualization

中文摘要英文摘要

随着西部大开发的进行,西部黄土区的工程建设越来越多,但近年来由此引发的黄土暗穴的形成和发展造成了大量的工程地质灾害,已成为一个不可忽视的课题。本文通过在有机玻璃容器中装入原状黄土,并置入带花管的漏水管道,来模拟自然界中管道渗水形成黄土暗穴的过程,从而探索暗穴的形成过程。通过直观剖面观测、录像等方式来描述暗穴形成的宏观表现,从而实现暗穴的可视化。然后利用扫描电镜(SEM)对比分析原状黄土在暗穴形成的不同阶段的微结构,初步探讨暗穴形成的结构成因,为黄土暗穴治理提供地质理论依据。

In the process of the western development, more and more construction work is building in the loess area,but it has taken frequent geotechnical engineering problems which were caused by formation and development of hidden holes in loess.Hidden holes in loess is an issue that should not be ignored in engineering construction. The aim of this paper is to attempt to model the natural process of formation of hidden holes in loess by putting intact loess into plexiglass Container, and meanwhile putting perforated pipe into loess. It can be visualization of formation of hidden holes to describe its macroscopic by observation of section plane and vedio tape. A comparative analysis of SEM photos was made to show the microstructure of different developmental stages,and the formation reason of structure of hidden holes was discussed preliminarily.The paper provides theory basis for the governance of hidden holes in loess.

熊峰、姜啸、王永刚

地质学灾害、灾害防治水利工程基础科学

黄土暗穴剖面观测可视化SEM微结构

Loess hidden holeProfile observedVisualizationSEMMicrostructure

熊峰,姜啸,王永刚.管道渗水诱发黄土暗穴的形成过程及其可视化研究[EB/OL].(2009-12-21)[2025-08-18].http://www.paper.edu.cn/releasepaper/content/200912-710.点此复制

评论