首页|对病险大坝加固措施的分析和稳定性评价

对病险大坝加固措施的分析和稳定性评价

Risky dam analysis and stability evaluation of reinforcement

中文摘要英文摘要

在双河拱坝刚建成不久,出现了一些贯穿性裂缝,这些裂缝对大坝的安全性造成不利影响。文中建立了三维有限元模型来考察裂缝成因。基于对不同工况的应力敏感性分析,得到一下结论:正常蓄水位工况下的温降最危险,而且温降是裂缝开展的主要成因。本工程采纳了四项措施来加固拱坝。通过有限元的方法求解出加固前后的位移,应力和安全系数来进行比较。计算结果说明,加固后的拱坝是安全稳定的。

Shortly after construction of the Shuanghe Arch Dam, substantial perforative cracks emerged, and these cracks would threaten the stabilization of the dam. A three dimensional model was established and the finite element analysis was employed to investigate the formation cause of the cracks. From the stress sensitive analysis in different types of loading case, the results show: The load combination condition of normal water level and temperature drop is most dangerous, and the temperature drop is the main external cause of crack growing. Four policies were applied to reinforce the arch dam: Thickening the dam body between 491.70~525.00m; consolidation grouting in downriver foundation; downriver drainage system; prestressed anchor in downriver slope. The finite element method is used to analyse the displacement, stress and the safety degree of abutment with comparing the reinforced dam to that without reinforcement. The results indicate that the reinforced arch dam is safe and stable.

梁栋

水工结构水利工程施工水利枢纽、水工建筑物

裂缝温降荷载组合安全系数双河拱坝

crackstemperature dropload combinationsafety factorShuanghe Arch Dam

梁栋.对病险大坝加固措施的分析和稳定性评价[EB/OL].(2009-03-17)[2025-08-02].http://www.paper.edu.cn/releasepaper/content/200903-608.点此复制