污水处理PPP项目投资结构研究
Investment Structure Research of Sewage Treatment PPP Project
本文首先对污水处理PPP项目相关文献进行了分析,认为影响其公私双方投资比例的因素有总投资额、特许经营期、日处理量、处理单价、运营维护费、投资回报以及收益分配系数等因素,据此构建了基于蒙特卡罗模拟技术的投资结构优化模型,并引入一个简化案例,说明模型的运行过程。实证结果表明,该模型能构造投资结构与处理单价、让利系数和特许经营期之间的关系,由此确定各要素的最佳取值,为公私双方就投资结构的谈判提供了一种可行的方法。
his article first analyses the related literature of sewage disposal PPP project, thought there are many factors influence the Public Private Partnership investment proportion,such as total investment, franchising, operation period of processing, processing unit price, operation maintenance, return on investment and income distribution coefficient. Then based on Monte Carlo method simulation technique building the investment structure optimization model, and introduce a simplified demo, demonstrates operation process .The empirical results show that this model can construct the relationship between investment structure , processing unit price, and concession period ,determine the best value of all the elements and provide a feasible method for the public-private investment structure of negotiations .
沈义、熊华平
环境污染、环境污染防治环境保护组织、环境保护会议废物处理、废物综合利用
污水处理PPP模式投资结构蒙特卡罗
Sewage TreatmentPublic Private PartnershipInvestment StructureMonte Carlo method?????
沈义,熊华平.污水处理PPP项目投资结构研究[EB/OL].(2017-02-06)[2025-08-02].http://www.paper.edu.cn/releasepaper/content/201702-30.点此复制
评论