大吨位预应力锚索质量控制若干问题探讨
iscussion of Problems Relative to Large Tonnage Prestressed Tendon Quality Control
本文以四川省紫兰坝水电站预应力锚索施工过程中所遇到的问题为出发点,在监理人员熟悉预应力锚索张拉系统的操作方法及有关预应力施工规范的条件下,通过现场的“旁站”监督,总结出了针对于预应力锚索张拉的监理方见解,在下个阶段的预应力锚索施工中,取得了较好的效果。在此希望能为同类的水电工程施工提供可借鉴的经验。
Based on problems of prestressed tendon construction from Zi lan-ba Hydroelectric Power Station in Szechwan province, the operational instruction of stressing system and the relative specifications of prestressed tendon construction are well known, and by using “the scene of supervision”, understandings of consultant engineers were pointed out, the delightful stage-result have been obtained. Hereon,this article provides referenced experience on the theoretical analysis as well as the actual operation control for others hydroelectric project construction.
栗军奇
水利工程施工水工材料
紫兰坝水电站 预应力锚索 质量控制 张拉观测
Zi lan-ba Hydroelectric Power Stationprestressed tendonquality controlobservation of straining and pulling
栗军奇.大吨位预应力锚索质量控制若干问题探讨[EB/OL].(2006-04-17)[2025-08-16].http://www.paper.edu.cn/releasepaper/content/200604-238.点此复制
评论